December 2022
- Categories:Recreate the glory (2022-2031)
- Author:
- Origin:
- Time of issue:2022-03-11 18:28
- Views:
(Summary description)The 1050mm continuous withdrawal and continuous washing hot acid line project was put into operation. So far, a 10 billion "smart factory" with digital factory, intelligent equipment and flexible production was born.
December 2022
(Summary description)The 1050mm continuous withdrawal and continuous washing hot acid line project was put into operation.
So far, a 10 billion "smart factory" with digital factory, intelligent equipment and flexible production was born.
- Categories:Recreate the glory (2022-2031)
- Author:
- Origin:
- Time of issue:2022-03-11 18:28
- Views:
The 1050mm continuous withdrawal and continuous washing hot acid line project was put into operation.
So far, a 10 billion "smart factory" with digital factory, intelligent equipment and flexible production was born.
Scan the QR code to read on your phone
-
Building 1, No. 2 Fengying Road, Wuzhou City, Guangxi Zhuang Autonomous Region
Copyright: © 2022 Guangdong Jinhaihuihuang Group Co., Ltd. 粤ICP备2021143131号 Powered by www.300.cn